Testbed Leader: Steklarna Hrastnik
Cesta 1. maja 14, 1430 Hrastnik, Slovenia
Director (or representative): Tilen Sever
Project Description
Hrastnik1860, as a project partner, will implement a hydrogen pilot for the glass industry by integrating a large-scale PEM water electrolyser and hydrogen storage into an oxyfuel glass furnace. The system will utilize both hydrogen and oxygen generated by electrolysis, enhancing the energy efficiency of the furnace and driving much-needed decarbonization of the glass melting process. This initiative aims to establish a sustainable and reliable supply of renewable energy, positively impacting the industry’s environmental footprint.
Impact and Benefits
A 3 MW water electrolyser system will be integrated with the existing 120 MTPD oxyfuel furnace. Both hydrogen and oxygen will be utilized to improve overall energy efficiency. Partially powered by renewable energy sources (RES), the system will feature advanced control mechanisms and mid-pressure hydrogen storage to manage fluctuations in supply and optimize performance. A cutting-edge hydrogen combustion system will enable flexible intake of hydrogen and oxygen into the furnace, supporting decarbonization efforts.